Eastern Railway HQ · Health Intelligence
Aggregate engineering metrics from the latest OMS recording run. Use the division switcher to drill in.
Latest Run
22 Oct — 29 Oct 2024
Total OMS Peaks+12%
1242
vs 1105 last run
Peaks per KM-0.02
0.14
System avg 0.12
Avg Ride Indexstable
2.14
Target < 2.00
Vulnerable Locations+4 new
48
22 critical
Severe Peaks > 0.20g-8%
114
Lateral focus
Maintenance Success+5%
84%
Post-tamping
Failed Maintenancehigh
12
Regressed post-work
Recurring Defect Zoneswatch
12
Chronic spots
Section-wise Peak Comparison
Current vs previous OMS run, sorted by deterioration
| Section | PWI | Prev P/KM | Curr P/KM | Trend |
|---|---|---|---|---|
| HWH-BWN | PWI/HWH/1 | 0.04 | 0.03 | ↓ 25% |
| BWN-ASN | PWI/BWN/E | 0.27 | 0.11 | ↓ 59% |
| ASN-DGR | PWI/ASN/E | 0.04 | 0.09 | ↑ 125% |
| SDAH-LGL | PWI/SDAH/N | 0.12 | 0.13 | ↑ 8% |
| MLDT-NFK | PWI/MLDT/N | 0.18 | 0.14 | ↓ 22% |
| PAN-BWN | PWI/PAN/2 | 0.09 | 0.06 | ↓ 33% |
Division Ranking
Composite OMS health score
01
Howrah92
02
Malda84
03
Sealdah84
04
Asansol58
Score = Peaks/KM (40%) + RI Stability (30%) + Maintenance Efficacy (30%).
Critical Vulnerable Locations
Severe lateral & vertical peaks requiring engineering attention